Plumbing Information

Share & Bookmark, Press Enter to show all options, press Tab go to next option
Print
Title Number Description Author*
Water Heater Strap P-106 Installation detail for earthquake strapping of water heaters SNBO
LP Gas Tank P-101 Liquefied petroleum gas piping requirement from tank to regulator at structure. SNBO
Gas Below Slab P-102 Installation detail of natural gas line below a concrete slab on grade. SNBO
LP Gas Below Building P-103 Installation detail of liquefied petroleum gas line below a concrete slab on grade. SNBO
Grease Interceptor P-104 Installation of a grease interceptor based on our local amendments. SNBO
Sand/Oil Interceptor P-105 Installation of a sand/oil interceptor based on our local amendments. SNBO

*The author indicates the group or organization that prepared the document and is responsible for its contents and maintenance.

  • SNBO: Southern Nevada Building Officials
  • COHBFS: City of Henderson Department of Building and Fire Safety
  • COHCD: City of Henderson Community Development Department.

Free viewers are required for some of the attached documents.
They can be downloaded by clicking on the icons below.

Acrobat Reader Download Acrobat Reader Windows Media Player Download Windows Media Player Word Viewer Download Word Viewer Excel Viewer Download Excel Viewer PowerPoint Viewer Download PowerPoint Viewer