Taking Care of our Four-Legged Friends
Animal Shelter Improvements
Making improvements to the Animal Care and Control facility located at 300 E. Galleria Dr. is a priority for the City of Henderson. Animal Care and Control has developed a plan to address both immediate and long term needs for the Animal Shelter.
About the Henderson Animal Shelter
The Henderson Animal Care and Control Shelter is a no-kill shelter, dedicated to the health and safety of each animal in its care. A full-time veterinarian works on site to provide medical care and assistance. The Shelter takes in dogs, cats, as well as many other types of animals.
Get involved!
The best way to help support the Henderson Animal Shelter is to get involved. We are always looking for volunteers or people willing to foster animals. To find out more about getting involved, visit our Volunteer webpage.
Animal Shelter Projects
PROJECT | STATUS | ESTIMATED COMPLETION |
---|---|---|
Added Sally Port Electrical | Completed | Completed |
Cleaned Air Conditioning Diffusers | Completed |
Completed |
Cleaned Insect Area | Completed |
Completed |
Install Enhanced Shade Structures Over Turtle Enclosures | Completed | Completed |
Explore Options to Repair or Grind Epoxy | In Progress | TBD |
Grate Over Sewage Trough - Temporary Fix in Place | In Progress | TBD |
Install Commercial Washer and Dryer | Completed |
Completed |
Replace Commercial Washer Due to Installation Issues | Completed | Completed |
Install Corner Guards at all 90 Turns in Gyp. Bd. Locations - Waiting for Pricing | Future Consideration | TBD |
Installed Additional Pigeon Spikes | Completed |
Completed |
Installed Plexiglass Panels on Front of Kennels | Completed | Completed |
Installed Power for Laundry Room | Completed |
Completed |
Kennel Replacement |
Future Consideration | TBD |
LED Retrofit of Facility |
Completed |
Completed |
Level Lockers - FM is Proposing Construction Modifications |
In Progress | TBD |
New FRP or Equal In: Restrooms, Breakroom, Corridors, Janitor Closet, Rooms in Back of House with Washing Tubs |
Future Consideration | TBD |
New Sink in Sallyport - Routing Contract/Insurance Information | In Progress | TBD |
Ponding Water at Dumpsters | Completed | Completed |
Reclassification of Existing FTEs | Completed | Completed |
Relocation of Misting System | Completed | Completed |
Remove Existing Trash Enclosure & New Enclosures Built | Future Consideration | TBD |
Remove/Replace Rear Access Gate with New Gate Located Closer to Moser | Future Consideration | TBD |
Removed Peeled Paint on Ductwork | Completed |
Completed |
Repaired Dog Run Fence | Completed | Completed |
Repaired Door Handle | Completed |
Completed |
Repaired Drywall Patch | Completed |
Completed |
Repaired Gate Clasps | Completed |
Completed |
Repaired Leaking Hose Bibs |
Completed |
Completed |
Repaired Misting Nozzles |
Completed |
Completed |
Repaired Rusted Metal Door Frame Bottoms | Completed |
Completed |
Repaired Water Softener |
Completed |
Completed |
Repaired/Painted Metal Doors | Completed |
Completed |
Replace Corrugated Steel Metal Roof |
Future Consideration | 2024 |
Replace Countertop and Mount to Wall in Reception Area |
Future Consideration | TBD |
Replace Dog and Cat Separation Gate in Reception Area |
Future Consideration | TBD |
Replace Grass with Artificial Turf in Exterior Dog Runs |
Future Consideration | TBD |
Replace Incinerator - Installed and in Commissioning Process |
Completed | Completed |
Replaced Stained Ceiling Tiles |
Completed | Completed |
Replace Swamp Coolers with Air Conditioning Units |
Future Consideration | 2024 |
Replaced Washing Machine | Completed |
Completed |
Requested Different Room Signs |
Future Consideration | TBD |
Restroom Redesign to Accommodate Lockers |
Future Consideration | TBD |
Rust at Kennels (Repairs vs Replacement) |
In Progress | TBD |
Separate Structure (Detached) for Overflow when Kennels are at Capacity |
Future Consideration | TBD |
Third-Party Performs an Operational Analysis on the Shelter | In Progress | 4 Months from Vendor selection on Nov. 1 |
Construct Three Additional Dog Runs in the Back of the Facility |
In Progress | TBD |
Sidewalk to New Dog Run Area | In Progress | TBD |
Extend Existing Sidewalk, Install Drain Area, and Paint with Grit Pain | In Progress | TBD |
Walking Surface from Existing Facility to New Dog Run Area | In Progress | TBD |
Metal Weave Over Kennel Area | Completed | Completed |
Turf Two Existing Dog Runs that are Currently Dirt | In Progress | TBD |
Convert 2 Part Time Positions to Full Time Positions | Completed | Completed |
Staffing JAQ | In Progress | TBD |